Why lines outperform machine shopping

A 200 t/h jaw feeding a 120 t/h cone is a 120 t/h plant with an expensive bottleneck. Buyers who purchase machines separately discover these mismatches at commissioning. We balance every stage against one material test and one capacity target before steel is cut.

Reference configurations

Plant classTypical sequenceSuited material
50–80 t/hFeeder → PE 400×600 jaw → PF-1007 impact → 2-deck screenLimestone aggregate
150–200 t/hFeeder → PE 600×900 jaw → PF-1214 impact or 3-ft cone → 3-deck screenLimestone / granite
300–350 t/hFeeder → PE 750×1060 jaw → 4.25-ft cone ×2 → 3/4-deck screensGranite, basalt
500 t/hFeeder → PE 1200×1500 jaw → cone bank → screen bankHard rock, high volume

These are reference flows, not fixed packages. Your material test and product list set the final configuration.

Scope we typically deliver

Related pages

Coordinated sourcing from Gongyi

  • Sourced in Gongyi. Machines are welded, machined and assembled at qualified Gongyi-area partner plants we coordinate — clear specs, no mystery markups.
  • Inspected before shipment. Every line is trial-run or inspected at the partner plant before dispatch; you receive video or on-site evidence with the inspection report.
  • Spare parts from stock. Wear parts and standard components ship with the machine, with factory stock behind every order.
  • 12-month warranty. Core machinery is covered for 12 months, backed by lifetime technical support from our engineers.

See visits & QC →

Request a sourcing proposal

Send us your raw material, target capacity and destination port. We will reply with a coordinated configuration, sourcing proposal and production schedule.

Request a machinery solution ↗