Record these points before production
- Equipment list, drawings and the exact scope being supplied.
- Material or test basis, operating conditions and measurable outputs.
- Critical dimensions, component brands or alternatives where relevant.
- Inspection date, attendees, documents and treatment of deviations.
- What must be checked before shipment and what belongs to site commissioning.
Evidence to request
- Updated drawings, nameplates and serial records where applicable.
- Photographs or video tied to identifiable equipment, not generic catalogue images.
- Test records that state the test basis and limitations.
- Packing list, shipping marks and agreed export documents.
This guide is a framework, not a certification or a substitute for a qualified inspection body. Project-specific standards and local requirements must be confirmed with the buyer, supplier and relevant advisers.
Need an inspection plan?
Send the equipment scope and required result. We will help list the questions before you schedule a check.
Request a machinery solution ↗