A. Test run

B. Machine condition

C. Documents

D. Packing & loading

After the checklist

The inspection report and photos go to you with the balance invoice. When the balance arrives, the container ships. That sequence — inspect first, pay second — is the whole protection, and it costs nothing but scheduling. See how our workshop runs this and how deliveries are documented.

Factory-direct from Gongyi

  • Built in Gongyi. Machines are welded, machined and assembled at our own production base in Gongyi, Henan — no trading-company margin.
  • Test-run before shipment. Every line is trial-run with material before it leaves the workshop; you receive video evidence with the inspection report.
  • Spare parts from stock. Wear parts and standard components ship with the machine, with factory stock behind every order.
  • 12-month warranty. Core machinery is covered for 12 months, backed by lifetime technical support from our engineers.

See our production base →

Get a factory quotation

Send us your raw material, target capacity and destination port. Our engineers will reply with a matched configuration, ex-works price and production schedule.

Request a machinery solution ↗