Start with the site and material

Record the material, maximum feed size, hardness, moisture, abrasiveness, target products and required capacity. Then describe the quarry or project layout, haul distance, available power, water, access roads and expected operating period. These inputs determine whether mobility creates a real advantage or adds unnecessary complexity.

When a mobile route can make sense

Mobility does not remove the need for feeders, conveyors, dust control, power planning or maintenance access. Ask for the complete route, not only the crusher chassis.

When a stationary route can make sense

A stationary plant may provide a cleaner long-term layout, but the quotation must include civil interfaces, structures, conveyors, controls and commissioning responsibilities.

Compare the total scope

  1. Ask each supplier to state the process flow and design assumptions.
  2. Compare included equipment, auxiliaries, spare parts and exclusions.
  3. Check transport dimensions, loading method and destination constraints.
  4. Agree inspection evidence, acceptance criteria and after-sales boundaries.

There is no universal capacity or machine combination. A supplier-ready RFQ should let you compare like with like and identify what still needs testing or site confirmation.

Need help choosing the route?

Send the material, capacity, site and destination. We will structure the questions before coordinating a Gongyi equipment proposal.

Review crushing and screening solutions ↗