The sequence
| Step | Detail |
|---|---|
| 1. Confirm standards route | ECAS (Emirates Conformity Assessment Scheme) applies to regulated product categories; much industrial machinery clears on standard documentation, but verify your HS codes early. |
| 2. Shipping | Jebel Ali for Dubai and the south; Fujairah for quarry-side deliveries on the east coast. Container, flat rack or break-bulk by machine size. |
| 3. Customs | Duty typically 5% CIF; VAT 5%. Free-zone import defers duty if the machine re-exports. |
| 4. Re-export (if applicable) | Much machinery lands in the UAE bound for Saudi, Oman or East Africa — declare the final destination correctly at booking, because documents follow it. |
Documents we prepare
- Commercial invoice, packing list, bill of lading, certificate of origin.
- Test-run report and inspection sheet for your records and any L/C terms.
- English manuals and wiring diagrams; CE documentation where a free-zone buyer needs EU-standard files.
Practical notes
- UAE runs 400V/50Hz — standard for our machines, but confirm site supply before production.
- Free-zone vs mainland import is a tax and paperwork decision — your clearing agent should price both.
- Heat and coastal salt air affect specification: say where the machine will live, and we'll spec electrics and paint accordingly.
Related
Factory-direct from Gongyi
- Built in Gongyi. Machines are welded, machined and assembled at our own production base in Gongyi, Henan — no trading-company margin.
- Test-run before shipment. Every line is trial-run with material before it leaves the workshop; you receive video evidence with the inspection report.
- Spare parts from stock. Wear parts and standard components ship with the machine, with factory stock behind every order.
- 12-month warranty. Core machinery is covered for 12 months, backed by lifetime technical support from our engineers.
Get a factory quotation
Send us your raw material, target capacity and destination port. Our engineers will reply with a matched configuration, ex-works price and production schedule.
Request a machinery solution ↗