When to choose a cone over an impactor
Impact crushers win on shape for medium-hard stone; cone crushers win on wear cost and uptime when the rock is hard and abrasive. If your wear-part bill on an impactor keeps climbing, the material is telling you it wants a cone.
Types we build
| Type | Best for | Notes |
|---|---|---|
| Spring cone (PY series) | Budget-conscious secondary crushing | Simple, repairable anywhere |
| Symons cone | Standard and short-head duties | Global spare-part compatibility |
| Hydraulic cone | Higher automation, tramp-iron protection | Fast discharge adjustment |
Typical range
| Size | Indicative capacity | Typical position |
|---|---|---|
| 2 ft / 600 mm | 20–60 t/h | Small plant secondary |
| 3 ft / 900 mm | 50–150 t/h | Mid-size secondary |
| 4.25 ft / 1300 mm | 110–300 t/h | Large secondary / tertiary |
| 5.5 ft / 1650 mm | 220–500 t/h | High-capacity circuits |
Closed-side setting and cavity type (standard, medium, short head) shift these ranges significantly.
What a quotation should clarify
| Quotation area | Questions to record |
|---|---|
| Cavity | Standard, medium or short head — matched to feed size and product target? |
| Wear parts | Mantle and concave material, expected life on your rock, price per set? |
| Lubrication | Thin-oil station included? Cooling requirement for your climate? |
| Protection | Spring release or hydraulic clearing for tramp iron? |
Related equipment
Coordinated sourcing from Gongyi
- Sourced in Gongyi. Machines are welded, machined and assembled at qualified Gongyi-area partner plants we coordinate — clear specs, no mystery markups.
- Inspected before shipment. Every line is trial-run or inspected at the partner plant before dispatch; you receive video or on-site evidence with the inspection report.
- Spare parts from stock. Wear parts and standard components ship with the machine, with factory stock behind every order.
- 12-month warranty. Core machinery is covered for 12 months, backed by lifetime technical support from our engineers.
Request a sourcing proposal
Send us your raw material, target capacity and destination port. We will reply with a coordinated configuration, sourcing proposal and production schedule.
Request a machinery solution ↗